What is roof pitch?
Roof pitch says how steep a roof is as inches of rise for every 12 inches of level run, written 6/12 or "6 in 12". IKO's estimating guide calls this the slope, in inches per foot of run, and uses "pitch" for rise ÷ span (the full width): a roof 24 ft across that rises 8 ft has a pitch of 8/24 = 1/3, or a slope of 8 in per foot. Most people, and this calculator, mean the 8/12 figure.
Source IKO · Estimating How Much Roofing Is Required (roof pitch and slope, Table 1) ↗
How to calculate roof pitch
Here it is with your numbers:
- Divide the rise by the run: 6 ÷ 12 = 0.5.
- Multiply by 12 for the pitch: 0.5 × 12 = 6, so the pitch is 6/12.
- The angle is the arctangent of rise ÷ run: arctan(0.5) = 26.57°.
- Multiply rise ÷ run by 100 for the slope: 0.5 × 100 = 50%.
- The pitch factor is √(1 + (rise ÷ run)²): √(1 + 0.5²) = 1.118.
It means the roof climbs 6 inches for every 12 inches across. OSHA counts it as a steep roof (over 4 in 12).
Rise ÷ run is the tangent of the roof's angle, so the angle is its arctangent. The pitch factor is how much longer the slope is than the run: multiply a roof's footprint by it to get the roof's area.
Source Common Core State Standards · High School Geometry, solving right triangles (G-SRT.C.8) ↗
Low-slope and steep roofs
OSHA's construction safety rules define a low-slope roof as 4 in 12 or less and a steep roof as more than 4 in 12. The label on the result follows those definitions, decided on the pitch as shown.
Source eCFR · 29 CFR 1926.500(b), OSHA definitions of low-slope and steep roofs ↗
Common roof pitches
| Pitch | Angle | Slope |
|---|---|---|
| 1/12 | 4.76° | 8.33% |
| 2/12 | 9.46° | 16.67% |
| 3/12 | 14.04° | 25% |
| 4/12 | 18.43° | 33.33% |
| 5/12 | 22.62° | 41.67% |
| 6/12 | 26.57° | 50% |
| 7/12 | 30.26° | 58.33% |
| 8/12 | 33.69° | 66.67% |
| 9/12 | 36.87° | 75% |
| 10/12 | 39.81° | 83.33% |
| 11/12 | 42.51° | 91.67% |
| 12/12 | 45° | 100% |
| 14/12 | 49.4° | 116.67% |
| 16/12 | 53.13° | 133.33% |
| 18/12 | 56.31° | 150% |
| 24/12 | 63.43° | 200% |
Factors are √(1 + (rise ÷ run)²) rounded to 3 decimals. IKO's printed table gives 1.157 for 7/12 and 1.356 for 11/12; worked out exactly they round to 1.158 and 1.357.
FAQs
How do you calculate roof pitch?
Measure 12 inches level along a rafter or the roof, then measure straight up to the roof: that rise is the pitch, written like 6/12. For any other run, divide the rise by the run and multiply by 12. IKO also shows how to read it from the ground with a carpenter's folding rule.
Source IKO · Estimating How Much Roofing Is Required (roof pitch and slope, Table 1) ↗
What's a 2% slope in degrees?
1.15°. A 2% slope rises 2 for every 100 across, and arctan(0.02) = 1.15°. As a roof pitch it is 0.24/12, about a quarter inch per foot.
Source Common Core State Standards · High School Geometry, solving right triangles (G-SRT.C.8) ↗
How steep is a 5% slope?
A 5% slope rises 5 for every 100 across: 2.86°, or a pitch of 0.6/12. That is well under the 4/12 that OSHA uses as the line between a low-slope and a steep roof.
Source eCFR · 29 CFR 1926.500(b), OSHA definitions of low-slope and steep roofs ↗
Sources
- IKO: Estimating How Much Roofing Is Required (roof pitch and slope, Table 1)
- eCFR: 29 CFR 1926.500(b), OSHA definitions of low-slope and steep roofs
- Common Core State Standards: High School Geometry, solving right triangles (G-SRT.C.8)